US English (US)
MX Spanish (Mexico)

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Contact Us
English (US)
US English (US)
MX Spanish (Mexico)
  • Home
  • ERA Live

How to Export a Project with Ownership

Written by Eric Cogburn

Updated at September 30th, 2022

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • ERA Live
    Dashboards
  • ERA
  • K&M Services
+ More


How to Export Project Ownership

Prerequisites:

●     User is logged into ERA Live

●     Project has been taken online

●     Required Access:

○     Account: User

○     Project: Owner

○     Dashboard: N/A

 

Ownership can be exported while either connected or disconnected.  If ERA Live is disconnected, the user must already have been logged in to ERA Live so that ERA recognizes the user as the project owner.

Export with Ownership

  1. Start the process:
    1. For the currently-open project, there are two methods:
      1. Click the flyout button  next to the sidebar Export button,
        then click the “Export with Ownership” button.
      2. OR right-click anywhere on the project desktop, then select the
        “Export with Ownership” context menu item.

  

    1. For any project in the Projects list (not only the open project), there are two methods:
      1. Right-click a project in the list, then select the “Export with Ownership” context menu item.
      2. OR
        1. Check a single project in the list:
          1. Note:  Having no projects or multiple projects checked disables the following Export with Ownership option.
        2. Click the dropdown arrow  next to the Export button.
        3. Select the “Export with Ownership” popup menu item.

 

 

  1. Acknowledge the warning by clicking OK.

 

  1. Specify where to save the ERA Project Ownership Export file (*.eraowner).

 

  1. Wait for the process to complete.  A spinner or hourglass cursor may appear and the ERA interface will be unavailable during this process.

  2. The saved ERA Ownership file has a distinct icon and extension (*.eraowner):



  1. If exporting the open project, observe that the project desktop banner changes color and the icon and label change to “Viewer”.

 

  1. If ERA Live is connected, the ownership state will also be updated on the server.  Because a new owner is not yet known, the owner will be blank / empty.
    1. The ownership change can be verified in the Add from Cloud dialog in ERA or on the ERA Live – Account Administration website.

 

 

Was this article helpful?

Yes
No
Give feedback about this article

Related Articles

  • How to Work Offline in ERA Live
  • How to Connect to a Time Data Source in ERA Live
  • How to Share a Project with ERA Live
  • Setting up a New ERA Live Account

About Us

  • About K&M Technology Group
  • Calendar
  • Case Studies
  • Did You Know
  • Blog
  • Support

Services

  • Offset Well Review
  • Well Design Review
  • Mechanical Feasibility Study
  • Construct Mechanical Earth Models
  • Technical & Operational Practices Support (TOPS)
  • Real-Time Operations Surveillance Service (ROPS)
  • Hole Condition Reporting Service (HCR)
  • Extended Reach Drilling
  • Horizontal Drilling
  • Technology Services
  • Dog Nose Plot

Training

  • Virtual & In-Person Training
  • Advanced Well Design and Stuck Prevention Virtual Training
  • ERA Training
  • 2-Day Horizontal and Extended Reach Drilling Operational Training Course
  • 3-Day Horizontal and Extended Reach Drilling Operational Training Course
  • 5-Day Horizontal and ERD Well Planning Course
  • 4-Day Geomechanics for Drilling Engineers Course
  • 2-Day Stuck Pipe Prevention Course
  • 4-Day Stuck Pipe Prevention Course
  • WellDefined Training
  • Learning Center
k+m technology group

US HQ: 480 Wildwood Forest Dr., Ste 440
The Woodlands, TX 77380
+1 281 298 6900

© 2020 K&M Technology Group. All Rights Reserved. Marketing + Website Design by: Graphic Design FX

Definition by Author

0
0
Expand