Handling Wells with Multiple Time Data Sets

Written by Eric Cogburn

Updated at December 21st, 2021

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • ERA Live
    Dashboards
  • ERA
  • K&M Services
+ More


Handling Wells with Multiple Time Data Sets

Background

To better accommodate ERA Live workflows, time data sets are treated differently in ERA 5 versus ERA 4. In ERA 4, time data sets were associated with projects, whereas in ERA 5, time data sets are associated with well designs. This difference requires a special merge process for some well designs when migrated from ERA 4 to ERA 5.


Most projects probably have one data set associated with each well design, in which case the merge is easy, and each data set will simply be brought into ERA 5 and associated with its well design. The case becomes more complex for well designs where multiple data sets were used. A common use case may be where one data set was used for one hole section and a different data set was used for a different hole section. In cases like this, ERA will detect that multiple data sets are associated with a single well design, and make its best attempt at merging the data, the segregation / rig state filters and the subop mappings. ERA will also display caution messages to alert the user of the merge.


Figure 1. Data sets are associated with well designs instead of projects in ERA 5. This requires a special merge process


  1. Upon opening the well, the Data Sources tab displays all the data sets that are associated with the well design. The last active data set (from ERA 4) will be enabled, indicated by the check box in the first column. Additional data set can be enabled or deleted as needed.




  1. The “Segregation” and “Rig State Filters” tabs show the merged data and subop segregation mapping.




  1. Taking a project with multiple data sets online will notify the user that all data sets will be enabled and uploaded.



  • Selecting Continue will take all time data sets online

  • Selecting Stay Offline opens the well in offline mode allowing for the data sets to be cleaned up prior to being taken online. Details of that process follow.


  1. Back in the “Data Sources” tab, clicking on each row shows the detailed information for each data set.


  1. To export an individual data set prior to deleting it, select the row and the click the “Export” button.  The data set that is selected will be exported.



  1. Once exported and saved, the data set can be deleted.



After the data set is deleted:



  1. Continue to repeat the process to remove any unwanted data sets.  These data sets can always be added back later.



Was this article helpful?

Yes
No
Give feedback about this article

Related Articles

  • How to Work Offline in ERA Live
  • How to Connect to a Time Data Source in ERA Live
  • Setting up a New ERA Live Account
  • Setting up a New User in ERA Live

About Us

  • About K&M Technology Group
  • Calendar
  • Case Studies
  • Did You Know
  • Blog
  • Support

Services

  • Offset Well Review
  • Well Design Review
  • Mechanical Feasibility Study
  • Construct Mechanical Earth Models
  • Technical & Operational Practices Support (TOPS)
  • Real-Time Operations Surveillance Service (ROPS)
  • Hole Condition Reporting Service (HCR)
  • Extended Reach Drilling
  • Horizontal Drilling
  • Technology Services
  • Dog Nose Plot

Training

  • Virtual & In-Person Training
  • Advanced Well Design and Stuck Prevention Virtual Training
  • ERA Training
  • 2-Day Horizontal and Extended Reach Drilling Operational Training Course
  • 3-Day Horizontal and Extended Reach Drilling Operational Training Course
  • 5-Day Horizontal and ERD Well Planning Course
  • 4-Day Geomechanics for Drilling Engineers Course
  • 2-Day Stuck Pipe Prevention Course
  • 4-Day Stuck Pipe Prevention Course
  • WellDefined Training
  • Learning Center
k+m technology group

US HQ: 480 Wildwood Forest Dr., Ste 440
The Woodlands, TX 77380
+1 281 298 6900

© 2020 K&M Technology Group. All Rights Reserved. Marketing + Website Design by: Graphic Design FX

Definition by Author

0
0
Expand