US English (US)
MX Spanish (Mexico)

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • Contact Us
English (US)
US English (US)
MX Spanish (Mexico)
  • Home
  • ERA Live
  • Dashboards
  • Dashboard Viewing Workflows

How do I navigate between subops?

Written by Eric Cogburn

Updated at December 21st, 2021

Contact Us

If you still have questions or prefer to get help directly from an agent, please submit a request.
We’ll get back to you as soon as possible.

Please fill out the contact form below and we will reply as soon as possible.

  • ERA Live
    Dashboards
  • ERA
  • K&M Services
+ More


Prerequisites

  1. Dashboard is enabled for account

  2. Project is online

  3. Well has been published


Required Access Level

Project: Owner/Viewer

or

Dashboard: Viewer


Shape1

How to navigate between subops

  1. Open the ERALive Dashboard homepage in a browser window. View the well that you want to see data for.


  1. There are two ways to navigate between subops: either through the time depth plot or the subop dropdown.

  2. Subops with mapped time data will display on the time depth plot. Mousing over different subops will cause them to become highlighted, and the subop that is currently being viewed is highlighted by default when no other subop is hovered. By clicking on a subop section, the dashboard will navigate to that subop


  1. There is also a dropdown below the time depth plot that allows navigation between different subops.


  1. Navigating to a new subop will cause the rest of the plots to update and show data for the newly selected subop.

Was this article helpful?

Yes
No
Give feedback about this article

Related Articles

  • How do I pin one of my wells as a favorite?
  • How do I view a plot full screen?
  • How do I publish my well design to the dashboard?
  • How do I customize my dashboard view?

About Us

  • About K&M Technology Group
  • Calendar
  • Case Studies
  • Did You Know
  • Blog
  • Support

Services

  • Offset Well Review
  • Well Design Review
  • Mechanical Feasibility Study
  • Construct Mechanical Earth Models
  • Technical & Operational Practices Support (TOPS)
  • Real-Time Operations Surveillance Service (ROPS)
  • Hole Condition Reporting Service (HCR)
  • Extended Reach Drilling
  • Horizontal Drilling
  • Technology Services
  • Dog Nose Plot

Training

  • Virtual & In-Person Training
  • Advanced Well Design and Stuck Prevention Virtual Training
  • ERA Training
  • 2-Day Horizontal and Extended Reach Drilling Operational Training Course
  • 3-Day Horizontal and Extended Reach Drilling Operational Training Course
  • 5-Day Horizontal and ERD Well Planning Course
  • 4-Day Geomechanics for Drilling Engineers Course
  • 2-Day Stuck Pipe Prevention Course
  • 4-Day Stuck Pipe Prevention Course
  • WellDefined Training
  • Learning Center
k+m technology group

US HQ: 480 Wildwood Forest Dr., Ste 440
The Woodlands, TX 77380
+1 281 298 6900

© 2020 K&M Technology Group. All Rights Reserved. Marketing + Website Design by: Graphic Design FX

Definition by Author

0
0
Expand